Phone: (864) 288-1986 Fax: (864) 288-2272
providing high quality services since 1969

A.E. DRILLING SERVICES, LLC

Printable PDF PDF version Environmental Projects

Environmental Projects
Project Fees Scope of Work
Shaw Air Force Base Sumter, South Carolina $1,650,000 Soil coring and double cased well installation to 300 feet via mud rotary, multiple borehole SVE well installation, extensive decontamination and containment, pumping well installation and testing.
Hoechst Celanese Rock Hill, SC
Greenville, SC
Greer, SC
Charlotte, NC
$2,000,000 Installation of single and double stainless steel monitoring wells to 250 feet, coring, discrete interval sampling, Tubex drilling, hydrofracing, sparging, HRC/ORC injection via DPT, injection wellfield installation.
Colonial Pipeline Georgia, South Carolina, North Carolina and Virginia $1,250,000 Extensive monitoring well and extraction well installation in soil and bedrock, MIP probing.
Barber Orchard Superfund Site North Carolina $350,000 Quadruple cased bedrock wells to 600 feet. Packer testing. DPT sampling, geophysical logging.
Eglin Air Force Base
Tyndall Air Force Base
Florida
$450,000 Monitoring well installation, direct push sampling.
Bluff Road Superfund Site Columbia, South Carolina $750,000 Installation of single and double cased monitoring wells via hollow stem augers and mud rotary, extraction and injection well installation.
Fort Rucker, AL
Camp Siebert, AL
Craig AFB, AL
Charlotte Naval Ammunition Depot
$350,000 Installation of saprolite and bedrock multiple cased monitoring wells, packer testing, coring.
BJ Landfill Atlanta, Georgia $100,000 Bedrock Extraction well installation through landfill waste.
Hoechst Celanese Corp. Shelby, North Carolina $150,000 Core drilling, reaming, packer testing and multiple borehole well installation to 300 feet.
Myrtle Beach, SC AFB $100,000 Installation of double cased monitoring and extraction wells
Blairsville, GA D.O.T. Site $125,000 Triple cased bedrock monitoring well installation to 250 feet. Packer testing.
Contaminated Water Supply Well Replacement $150,000 Water supply well installation to 500 feet in unconsolidated material and bedrock.
Various D.O.D. Superfund Sites and Chemical Well Industrial Rehabilitation $150,000 Chemical and physical rehabilitation of fouled extraction wells.
Hoechst Celanese Mount Holly, North Carolina $225,000 Soil borings, saprolite and bedrock monitoring and recovery wells, triple borehole piezometer and SVE installation, recovery well installation, pump tests, Level C Health & Safety.
Medley Farm Superfund Site Gaffney, South Carolina $400,000 Installation of single and double cased saprolite and bedrock wells to 250 feet, auger, core, air and mud rotary drilling, packer testing, and site access construction. Waterloo multiple borehole piezometer installation.
Platt Saco Lowell Easley, South Carolina $450,000+ Installation of single and double cased saprolite and bedrock wells to 350 feet, packer and pump testing, well abandonment, Level B Health & Safety.  Auger, mud rotary, and air drilling, vertical and inclined Geoprobe sampling
Fort Bragg North Carolina $200,000 Extensive GeoProbe Exploration.
Ciba-Geigy Superfund Site Aberdeen, North Carolina $150,000 Extensive soil borings, grouting, and decontamination procedures, well abandonment, single and double cased stainless monitoring wells via mud rotary.
Atlanta Gas Light Augusta, Georgia $120,000 Installation of triple cased bedrock monitoring wells to 250 feet.
Bliss Property Dioxin Investigation Superfund Site Ellisville, Missouri $27,000 Extensive soil borings, decontamination, and Level C Health & Safety.
General Electric Greenville, South Carolina $200,000 Installation of saprolite and bedrock single and double cased monitoring wells to 150 feet; packer testing, Hydropunch sampling, remediation system repair and maintenance.
Charleston Air Force Base Charleston, South Carolina $150,000 Installation of 75 monitoring wells and 100 soil borings; full containment, multiple borehole SVE well installation.
Sangamo Weston Superfund Site Pickens, South Carolina $150,000 Soil borings, saprolite and bedrock well installation, Level C Health & Safety.
Recovery System Installation
Wellman Palmetto Plant
Florence, South Carolina
$100,000 Installation of 6-inch stainless steel recovery wells, jet pumps, piping, and vaults.
Atlanta Gas Light Historic District Savannah, Georgia $150,000 Direct push exploration to 70 feet and monitoring well installation inside old forts necessitating disassembly and reassembly of drills, and remote power for drilling.
Square D Asheville, North Carolina $50,000 Bedrock well installation to 400 feet and packer testing.
Chestnut Ridge Site Study
Oak Ridge National Lab
Oak Ridge, Tennessee
$150,000 Soil and bedrock monitoring wells to 250 feet, packer testing.
Uranium Investigation Simpsonville, South Carolina $23,000 Drilling of exploration corehole to 750 feet to assess uranium presence in groundwater.
U.S. Finishing Greenville, South Carolina $100,000 Installation of single and double cased saprolite and bedrock wells, soil borings.
Anson County, NC Landfill Site Investigation $150,000 Soil borings, installation of single and double cased saprolite and bedrock wells to 200 feet, rock coring, air rotary and packer testing.
Sandoz Chemicals, Inc. Mount Holly, North Carolina $50,000 Abandonment of 6-inch bedrock wells to 600 feet, installation of double cased bedrock wells to 200 feet via mud rotary and air rotary, containment of all spoils.
Whitfield County Landfill Whitfield County, Georgia $150,000 Single and double cased monitoring and methane wells to 200 feet via air rotary in karst.
Parachem Plastics Superfund Project Simpsonville, South Carolina $150,000 Rock Coring and reverse packer testing to 250 feet; Hydropunch sampling, extensive decontamination and containment. Waterloo multiple borehole piezometer installation.
Occidental Chemicals Wilimington, North Carolina $75,000 Soil coring, well installation, and undisturbed sampling and in-situ vane shear testing of soft lagoon sediments.
Catoosa County, Georgia Landfill Monitoring Wells $70,000 Groundwater and methane monitoring well installation via air hammer and casing advancer in cavernous limestone to 250 feet.
Hoechst Celanese Greenville, South Carolina $200,000 Installation of 175 saprolite injection wells for HRC/ORC injection.
Defense Fuel Supply Point Charleston, South Carolina $120,000 Direct push and monitoring well installation, difficult access.
Redstone Arsenal Alabama $120,000 Continuous soil coring and monitoring well installation.
Augusta Utilities Augusta, GA $40,000 Installation of 500 ft stainless monitoring well in wellfield.
Injection Monitoring Wells Wilmington, North Carolina $115,000 Installation of triple cased monitoring well to 700 feet via mud rotary in artesian aquifer.
Ashland Chemical Atlanta, Georgia $250,000 Multiple cased bedrock monitoring wells and extraction wells to 250 feet; coring; packer testing.
Hitachi Greenville, South Carolina $100,000 Installation of heater and vacuum wells through boulder fill
Air Force Plant #6 Marietta, Georgia $300,000 Bedrock monitoring well installation, packer testing.
Landfill Sites Southeastern US $500,000 Deep monitoring well installation.
Ashland Chemical Georgia / South Carolina $200,000 Deep bedrock monitoring and extraction well installation via air rotary, coring, packer testing.
Federal Pacific Electric Edgefield, South Carolina $150,000 Bedrock well installation via air rotary, coring, packer testing.
Owens Corning Anderson, South Carolina $200,000 Bedrock well installation to 400-feet in Artesian conditions, Waterloo multiport installed, packer testing, multiple borehole well installation
Confidential Site Asheville, North Carolina $750,000 Double cased bedrock well installation to 300 feet; geophysical logging, packer testing, coring, DPT
Plum Brook Ordnance Works Sandusky, Ohio $300,000 Double cased bedrock monitoring wells, PQ coring, Geoprobe
Moog Components Murphy, North Carolina $500,000 Inclined electrode well installation to 100 feet.